Yes. In Michigan, a MISS DIG 811 locate is required before digging projects, and stump grinding counts. The locate is free and usually needs at least three business days. That is why a grind is rarely a same-morning surprise visit.
What gets marked, and what does not
Public utilities are the point of the ticket. Private lines are not: sprinkler pipe, lighting wire, a feed to a shed, an invisible dog fence. Those are easy to cut and expensive to repair. Walk us through anything you have added since the house was built.
If a crew ever shows up ready to grind and has not talked about a locate, ask. We plan the ticket into the schedule. Call (586) 991-1184 if you want that process started.